Gloss Polyaspartic Waterproofing: Application Recording

(b) Dust work on bright light waterproof coatings containing blue coatings, carvings and coating surface effects.

Back to the top level

Site records and project evidence

Photos and videos on this page show materials and application processes. They are not accepted-project records or performance test reports.

Project area
Material model and batch
Dry film thickness of each layer
Acceptance results and date

Porjaspartić porrea Light waterproof coating

The blue polyaspartic polyurea waterproof coatings are scraped. The builder lays the paint on substrate, spreads it out with a tooth-scratching plate, and completes the local fabric and large-face scraping.

Painting and carving.

The scratching started with local fabric and was gradually carried out along the construction path. Pile size, scratch angles and succession processing are the focus of the control coating parity, with specific usage and construction thickness to be carried out under the accompanying programme.

About 31 sec Live live video click play

Blue coating spreads on grey substrate with scratching texture on the edge.

polyaspartic polyurea.

Blue coating spreads on grey substrate with scratching texture on the edge.

On-site focus will be on shelf continuity, scratchboard angles and succession processing, with specific usage and construction thickness to be carried out under the accompanying programme.

Construction staff scratched the blue material with tooth scratchers

The carving board is covered with blue waterproof paint.

Construction staff scratched the blue material with tooth scratchers

On-site focus will be on shelf continuity, scratchboard angles and succession processing, with specific usage and construction thickness to be carried out under the accompanying programme.

Blue coated surface near the wall position.

Blue polyaspartic polyurea, bright waterproof surface

Blue coated surface near the wall position.

Images are used to record construction nodes and the state of the site; Specific material matching and acceptance requirements are implemented in accordance with the project construction programme.

Communications materials and construction requirements

Provide substrate type, use environment and construction requirements to facilitate technical access.

Advice on construction and materials