Site records and project evidence
Photos and videos on this page show materials and application processes. They are not accepted-project records or performance test reports.
- Project area
- Material model and batch
- Dry film thickness of each layer
- Acceptance results and date
polyaspartic polyurea soft-light waterproof coating
The gray polyaspartic polyurea satin-finish waterproof coating is spread with a notched trowel. Applicators work continuously along the substrate, depositing and spreading the material and joining adjacent sections to form a gray waterproof layer.
Points for the construction of a soft light waterproof coating
Large-face scraping should be carried out in such a way as to ensure that the material is even and continuous, and that the edges and fine parts avoid leakage or accumulation. Maintenance is arranged as required by the product after construction, pending the fulfilment of the required conditions for curing of the coating.
About 20 sec Live live video click play

Trowel application of a gray polyaspartic polyurea satin-finish waterproof coating
The carving is spreading grey paint.
On-site focus will be on shelf continuity, scratchboard angles and succession processing, with specific usage and construction thickness to be carried out under the accompanying programme.

Packaging of waterproof materials and grey coatings on site
Gray coating surface and skylight polyurea field packaging
Images are used to record construction nodes and the state of the site; Specific material matching and acceptance requirements are implemented in accordance with the project construction programme.
Communications materials and construction requirements
Provide substrate type, use environment and construction requirements to facilitate technical access.
Advice on construction and materials