Photos and videos on this page show materials and application processes. They are not accepted-project records or performance test reports.
- Project area
- Material model and batch
- Dry film thickness of each layer
- Acceptance results and date
Polyaspartic polyurea
The surface of the balcony is covered by a light blue waterproof coating with the construction area extending to the fence and the perimeter of the vase. The entire ground, together with the surrounding edges, forms the main part of the dam waterproofing construction.
The terrace floor and the perimeter.
Waterproofing of the terraces should also focus on wall-to-wall interfaces, the perimeter of the vases and drainage nodes, in addition to large-face coatings. Completion inspections were conducted in conjunction with coating appearances, nodal processing and project acceptance requirements.
About 9 sec Live live video click play
Communications materials and construction requirements
Provide substrate type, use environment and construction requirements to facilitate technical access.