Site records and project evidence
Photos and videos on this page show materials and application processes. They are not accepted-project records or performance test reports.
- Project area
- Material model and batch
- Dry film thickness of each layer
- Acceptance results and date
polyaspartic polyurea wall and paintboard spray construction
The white polyaspartic polyurea coatings were sprayed, and the operational areas included under-window walls and steel plates. Sprays are carried out on a segmented basis along the board, balancing the cavity type, the suture and the end of the wall.
Supplied, sprayed and edged overlay
The materials were then sprayed on the ground, and during the construction work, attention was paid to the covering of the spray bands with the edges. The paint plate dent, seams and bottoms should be checked for leaking coating, the thickness of the coating and the acceptance requirements should be carried out in accordance with the project construction programme.
About 47 sec Live live video click play
The actual matching, construction conditions and protective requirements shall be based on the technical documents and safety data sheets used for the products; Respiration, eye and skin protection should be implemented.

Polyaspartic polyurea paint window under wall spray
Construction staff sprayed white paint on the underside wall of the window
The focus at the site was on the swirling of the spray, the rim cover, and whether there had been any leakage of the grooves, seams and closing positions.

Polyaspartic polyurea laminates the steel plate with the bottom of the entrance
Splasher sprays white paint on the surface of the bellows.
The focus at the site was on the swirling of the spray, the rim cover, and whether there had been any leakage of the grooves, seams and closing positions.
Communications materials and construction requirements
Provide substrate type, use environment and construction requirements to facilitate technical access.
Advice on construction and materials